Tricity Montview

Sanpada

Overview

Tricity Montview is a high-rise residential cum commercial tower, a generous mix of spacious apartments and outdoor spaces. Tricity Montview Sanpada has been designed for luxurious family life. It is more than a contemporary residential development. It’s a lifestyle experience that offers you just about everything.

  • Project Type

    Apartments & Shops

  • Unit

    2BHK, 3BHK & Shops

  • Gross Carpet Area*

    Flat: 56.26 to 84.76 sq.mt.
    Shop: 27.40 to 51.87 sq.mt.

  • Location

    Tricity Montview, Plot No. 22+23, Sector 8, Sanpada, Navi Mumbai - 400705

  • CC Date

    07 MAR 2022

  • Expected Completion

    DEC 2026

* Gross carpet area is a sum of RERA carpet area and other attached area if any. For more details, please contact our office

LOCATION

Sanpada

NEARBY

  • Sanpada Railway Station - 900 m
  • New Millenium Hospital - 800 m
  • Rayan Int. School - 900 m
  • Hotel Yogi Executive - 1.5 km
  • Four Points - 2.1km
  • Palm Beach Road - 1.5 km
  • Inorbit Mall - 2 km
  • Vashi Railway Station - 2.2 km
  • Jaipuriar School - 1.9 km
  • Vashi central Mall - 2.2 km
  • Suraj Neurosurgery & Multispecialty Hospital - 1.9 km
  • Hotel Tunga - 2.2 km
  • St. Lawrence School - 3.1 km
  • Raghuleela Mall - 2.6 km
  • D.Y. Patil Hospital - 4 km

Amenities

External
  • LEISURE

    Swimming pool.

  • GYMNASIUM

    Hi-tech air conditioned gymnasium.

  • Maze

    Beautiful maze at podium level.

  • OUTDOOR SPACE

    Children play and sitting area.

  • CLUB HOUSE

    Multipurpose room for indoor games and events.

  • PARKING

    4 level of car parking.

  • RELAXATION ZONE

    Yoga and Zumba room.

  • LOBBY

    Air conditioned grand entrance lobby.

  • SHARED WORK SPACE

    Shared area for individuals working from home.

  • KID'S ACTIVITY AREA

    One great way to gain mental strength by engaging in indoor activities.

  • LIFTS

    Automatic hi-speed lifts of ThyssenKrupp or similar brand.

  • POWER BACKUP

    Power backup for lifts, common area, water pump and fire pump.

  • SECURITY

    CCTV in common area.

  • SOCIETY OFFICE

    Smooth functioning of society activities.

  • ELEVATION

    Attractive elevation.

  • EXTERNAL WALL

    Texture paint on all dead walls and full acrylic paint.

  • FIRE FIGHTING

    Modern fire fighting system.

  • PEST CONTROL

    Anti-termite treatment for the tower.

  • RCC

    Earthquake resistant RCC structure.

  • STAIRCASE

    Full marble moulded staircase till top floor.

Internal
  • SECURITY

    Video door camera and intercom integrated system of Ziacom or similar brand.

  • FLOORING

    Vitrified tiles by a reputed brand for the entire apartment.

  • INTERNAL WALL

    Complete apartment gypsum plumb finish with 100% plastic paint.

  • KITCHEN

    Granite moulded counter and additional service platform with Nirali S.S. sink and exhaust fan provision.

  • WINDOWS

    Anodized heavy aluminium sliding with mosquito net and moulded granite window sill.

  • ELECTRICAL

    Concealed copper wiring with modular switches and circuit breaker.

  • DOOR

    Laminated flush main door with elegant hardware fittings and waterproof bathroom doors.

  • INTERNET

    Broadband provision.

  • PLUMBING

    Concealed plumbing with Jaquar or similar fittings.

  • WASHROOM

    Coloured or White sanitary ware of a branded make, tiles up to beam bottom along with exhaust fan and geyser provision.

Project Progress

  • Overhead Watertank - WIP

    Project Progress Image
  • Overhead Watertank - WIP

    Project Progress Image
  • 23rd Slab Blockwork - WIP

    Project Progress Image
  • 23rd Slab Blockwork - WIP

    Project Progress Image
  • 25th Slab - WIP

    Project Progress Image
  • 25th Slab - WIP

    Project Progress Image
  • 24th Slab - WIP

    Project Progress Image
  • 24th Slab - WIP

    Project Progress Image
  • 22nd Slab - WIP

    Project Progress Image
  • 22nd Slab - WIP

    Project Progress Image
  • 20th Slab - WIP

    Project Progress Image
  • 20th Slab - WIP

    Project Progress Image
  • 18th Slab - WIP

    Project Progress Image
  • 18th Slab - WIP

    Project Progress Image
  • 18th Slab - WIP

    Project Progress Image
  • 16th Slab - WIP

    Project Progress Image
  • 16th Slab - WIP

    Project Progress Image
  • 16th Slab - WIP

    Project Progress Image
  • 15th Slab - WIP

    Project Progress Image
  • 15th Slab - WIP

    Project Progress Image
  • 15th Slab - WIP

    Project Progress Image
  • 13th Slab - WIP

    Project Progress Image
  • 13th Slab - WIP

    Project Progress Image
  • 13th Slab - WIP

    Project Progress Image
  • 11th Slab Completed

    Project Progress Image
  • 11th Slab - Completed (2)

    Project Progress Image
  • 11th Slab - Completed (3)

    Project Progress Image
  • 10th Slab - WIP

    Project Progress Image
  • 9th Slab - WIP

    Project Progress Image
  • 9th Slab - WIP

    Project Progress Image
  • 9th Slab - WIP

    Project Progress Image
  • 9th Slab - WIP

    Project Progress Image
  • 8th Slab - WIP

    Project Progress Image
  • 8th Slab - WIP

    Project Progress Image
  • 8th Slab - WIP

    Project Progress Image
  • 8th Slab - WIP

    Project Progress Image
  • 5th Slab - WIP

    Project Progress Image
  • 5th Slab - WIP

    Project Progress Image
  • 5th Slab - WIP

    Project Progress Image
  • 5th Slab - WIP

    Project Progress Image
  • 4th Slab- WIP

    Project Progress Image
  • 4th Slab - WIP

    Project Progress Image
  • 4th Slab - WIP

    Project Progress Image
  • 4th Slab - WIP

    Project Progress Image
  • 4th Slab - WIP

    Project Progress Image
  • 4th Slab- WIP

    Project Progress Image
  • 4th Slab- WIP

    Project Progress Image
  • 3rd Slab- Completed

    Project Progress Image
  • 3rd Sab- Completed

    Project Progress Image
  • 3rd Slab - Completed

    Project Progress Image
  • 3rd Slab - WIP

    Project Progress Image
  • 3rd Slab - WIP

    Project Progress Image
  • 3rd Slab - WIP

    Project Progress Image
  • 1st Slab - WIP

    Project Progress Image
  • 1st Slab - WIP

    Project Progress Image
  • 1st Slab - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image
  • Plinth - WIP

    Project Progress Image

Bank Approval Certificates

No.
Bank
APF No.
Certificates
1
SBI BANK
APF No. P05201518
2
HDFC
APF No. P1242780
NA
3
BAJAJ
APF No. NAV/2022/044327
NA
4
AXIS BANK
APF No. NVMPAS051614
NA

    Make An Enquiry

    I authorize Tricity Realty LLP and its representatives to Call, SMS, Email or WhatsApp me about its products and offers. This consent overrides any registration for DNC / NDNC.

    Please make sure you understand accept our terms before using this site. If you have further information before accepting our terms, please send us an email to sales@tricityltd.com

    Disclaimer